Bathroom remodeling, West Lake Hills, TX
RenovatePros remodels bathrooms in West Lake Hills, the city locals call Westlake. We do not post a bath price yet. You get a free consultation and an itemized quote. Next door in Rollingwood we fully updated the bathrooms of a dated home, with new tile and frameless glass showers.
- 4.9 on Google 59 reviews
- Owner on site managing the crew
- Itemized quote every line, up front
Bathroom remodeling in West Lake Hills: what is different here
Many homes here are older, and the city runs its own permit and septic programs.
- About 46% of homes in West Lake Hills were built before 1990, and the median year built is 1992 (Census ACS 2024 5-year).
- The city takes permit applications only online, through MyGovernmentOnline, and only on the first business day of each week.
- On a project of $25,000 or more, each contractor must register with the city and carry at least $600,000 in liability insurance before the permit is issued.
- The city runs its own septic permits and inspections. Homes on septic in the Edwards Aquifer recharge zone must pump out every 3 years, and every 7 years elsewhere.
- Westlake mailing addresses also cover Rollingwood and parts of Austin and Travis County, so the address decides who issues the permit.
Updating a Westlake bath
In a house from the 1970s or 1980s, a bath remodel often means new pipes and wiring behind the walls, not just new tile. We open that up at the free walkthrough so it is in the quote, not a surprise.
Then our in-house design team works with you on the shower, tile and vanity. The city’s weekly intake and review time go on the schedule first. You get an itemized quote, and a site supervisor runs the job.
Our work nearby
- Rollingwood Remodel: next door, bathrooms fully updated with new tile, frameless glass showers and new vanities, plus a full kitchen overhaul.
Bathroom remodeling: the full service page
City of West Lake Hills pages and Census ACS 2024, as researched 2026-10-16. Rules change; we confirm them for your address.
Photos
-
Rollingwood Remodel -
Rollingwood Remodel -
Rollingwood Remodel -
Rollingwood Remodel -
Westlake-area remodel by RenovatePros
What homeowners say
4.9 (59) Google reviews
-
Top-notch quality and fantastic customer support. Five stars!
-
The work was both high quality and affordable, and it was completed in a short amount of time.
-
Great communication throughout the process. Highly recommended!
Bathroom remodeling in West Lake Hills: questions we hear
Do I need a permit to remodel a bathroom in West Lake Hills?
Most real remodels do. The city lists remodels under its residential building permit, and single items like a water heater or window can fall under its small project permit. Applications go online, on the first business day of the week.
How long does the city take to review a bathroom remodel?
The city says first comments can take up to four weeks after the file is complete, and review repeats until every comment is answered. Small interior projects usually do not need a pre-application meeting.
My house is on septic. Does that change a bath remodel?
The city runs its own septic program, so ask its septic inspector if your plan adds a bedroom or more fixtures. We check before we draw.
Is my Westlake address inside the city?
Not always. The Westlake name covers parts of Rollingwood, Austin and Travis County too. The city tells people to check the Austin jurisdictions map, and we do that first.
More remodeling in West Lake Hills
-
Kitchen remodeling in West Lake Hills
Posted estimates of about $15,000 to $100,000, by budget, midrange and premium.
-
Whole-home renovation in West Lake Hills
Posted estimates of about $100,000 to $500,000 for older Westlake homes.
-
Home additions in West Lake Hills
Additions sized to the 25% cover cap, the trees and the septic.
Bathroom remodeling in nearby towns
78737 and the Hill Country